November 14, 2026 · 7 min read
Incoterms® for bulk liquid cargoes: FOB, CFR, CIF and DAP in petrochemical trade
How the common Incoterms rules allocate cost and risk when crude oil, fuels and liquid chemicals move by tanker — and what to agree beyond the three-letter code.
An Incoterms® rule tells the parties who arranges and pays for transport and insurance, and where risk passes from seller to buyer. For bulk liquids moving by tanker, the rules most often seen are FOB, CFR, CIF and DAP. The code alone is never enough: always state the version (for example Incoterms® 2020) and the named port or place.
FOB — Free On Board (named loading port)
The seller delivers the goods on board the vessel the buyer nominates at the loading port. The buyer charters the ship, pays freight and insurance, and bears risk once the goods are on board. FOB suits buyers that control their own shipping.
CFR — Cost and Freight (named destination port)
The seller arranges and pays for carriage to the destination port, but risk still passes when the goods are on board at loading. The buyer usually insures the voyage. Note the gap: the seller pays freight to destination, but the buyer carries the risk at sea.
CIF — Cost, Insurance and Freight (named destination port)
As CFR, plus the seller buys marine insurance for the buyer's benefit. Under Incoterms® 2020 the default CIF cover is the minimum (Institute Cargo Clauses C) unless the contract asks for more — specify the cover you need.
DAP — Delivered At Place (named place)
The seller bears cost and risk until the goods are ready for unloading at the named destination. Import clearance and duties remain with the buyer. DAP is common for parcels delivered by road tanker or ISO tank.
What the code does not cover
Bulk liquid contracts need more than an Incoterms rule. Agree, in writing:
- Quantity and quality determination — usually by an independent inspector at the load port, with volumes corrected to standard temperature.
- Laycan (laydays and cancelling) and vessel nomination and acceptance procedures.
- Laytime and demurrage — who pays if loading or discharge runs late.
- Tolerances on quantity (for example ±5% at seller's or vessel's option).
- Payment terms and the documents that trigger payment.
On Sentrick Petrochemical, every RFQ and quote records the Incoterms rule and named place alongside the specification, and quotes that differ from the rule you asked for are flagged before you compare prices. The contract itself is always between buyer and supplier — Sentrick is an intermediary and is never a party to the sale.
Source smarter on Sentrick Petrochemical
A qualified B2B wholesale petrochemicals marketplace — verified suppliers, professional buyers, logistics & customs partners worldwide.
